Case Study

The original ventilation system serving the operating theatres at Glasgow Royal Infirmary had become unreliable.

The system was served by two 1600mm variable pitch in motion fans designed to maintain “clean room” conditions in the theatres.

Ducting, dampers attenuation and one of the fans was replaced, enabling the hospitals’ operating theatres to function safely.

Type of system

Refurbing the theatre variable volume environmental fans and control system

GLASGOW ROYAL INFIRMARY
Equipment installed

Heavy duty duct work and attenuation manufactured and installed as well as a new fan assembly and damper rack.

GRI_2.jpg

Location

Glasgow

1200px-Wfm_glasgow_royal_infirmary.jpg

Number Of Levels

Basement/Ground floor

Glasgow_Royal_Infirmary_Clock_Tower_Block_(geograph_3754080).jpg

Type Of Building

Hospital

Glasgow._Glasgow_Royal_Infirmary.jpg

Date Of Commissioning

December 2012

Advanced Smoke Group Logo

Advanced Smoke Group Ltd
46 Kenilworth Drive,
Oadby Industrial Estate,
Leicester
LE2 5LG

Contact details

+44 (0) 116 271 6861 

email logo
Hi-Protect logo, representing advanced high-rise smoke ventilation solutions
The institute of fire engineers affiliate organisation logo
Registered management systems accreditaion certificate
safe contractor approved logo
IFC-Certification-logo
bsi logo
Gold_RGB.png
Smas Logo July 2024.png
Home    Reports    Hi-Protect    About     Contact    Services    Projects

© 2025 Advanced Smoke Group Ltd.

All rights reserved

Advanced Smoke Group Limited is a company registered in England and Wales under the number 6709805. Registered office: 46 Kenilworth Drive, Oadby Industrial Estate, Leicester, LE2 5LG

bottom of page