We receive contracts for many very interesting and prestigious projects. We are also often faced some very interesting challenges. The following are just a few examples of those projects.
The Fulham Reach building project is an extremely large development demanding a multi phased construction program.
Advanced Smoke Group were asked to install a smoke ventilation system serving a basement services area below the Palace of Westminster buildings.
The refurbishment of the Blackwall Tunnel involved the replacement of the original outdated and inadequate ventilation system
The original ventilation system serving the operating theatres at Glasgow Royal Infirmary had become unreliable.
As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.
The Fulham Reach building project is an extremely large development demanding a multi phased construction program.
The Fulham Reach building project is an extremely large development demanding a multi phased construction program.
A major new shopping mall was constructed in the centre of Bradford.
A completely refurbished building to provide a new hotel. A fully mechanical roof mounted atrium smoke ventilation system was required, and car park ventilation system.
Advanced Smoke Group provided design team support on car park ventilation and residential block smoke control throughout the development of the construction Beaufort Park site
Advanced Smoke Group were asked to install a smoke ventilation system serving a basement services area below the Palace of Westminster buildings.
Whether you need assistance with your project, interested in our products or a general enquiry, please do not hesitate to contact us.
T: 0116 271 6861
F: +44 (0) 116 272 8849
mail@advancedsmoke.co.uk
46 Kenilworth DriveOadby
Leicester
LE2 5LG