+44 (0) 116 271 6861
Blackwall tunnel

The refurbishment of the Blackwall Tunnel involved the replacement of the original outdated and inadequate ventilation system

Glasgow Royal Infirmary

The original ventilation system serving the operating theatres  at Glasgow Royal Infirmary had become unreliable.

Paddington station

As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.

Fulham Reach Car Park

The Fulham Reach building project is an extremely large development demanding a multi phased construction program.

Fulham Reach Residential Apartment Blocks

The Fulham Reach building project is an extremely large development demanding a multi phased construction program.

Bradford Broadway Shopping Centre

A major new shopping mall was constructed in the centre of Bradford.

Mannin Hotel

A completely refurbished building to provide a new hotel. A fully mechanical roof mounted atrium smoke ventilation system was required, and car park ventilation system.

Beaufort Park

Advanced Smoke Group provided design team support on car park ventilation and residential block smoke control throughout the development of the construction Beaufort Park site

Palace of Westminster

Advanced Smoke Group were asked to install a smoke ventilation system serving a basement services area below the Palace of Westminster buildings.

Contact Us

Whether you need assistance with your project, interested in our products or a general enquiry, please do not hesitate to contact us.

Contact details given in this form will be entered on to our database and only used to contact you in connection with your enquiry.
Advanced Smoke Group Ltd

T: 0116 271 6861
F: +44 (0) 116 272 8849
mail@advancedsmoke.co.uk

46 Kenilworth DriveOadby
Leicester
LE2 5LG